This is an original created by me. There was a painter arriving at work. He looked at his to-do list which read: He has 10 walls to paint and 6 hours to finish all by himself. Each 12' by 13' wall required a half gallon of paint. Once he was halfway finished with the job, he got high from the paint and spilled 1 and 1/4 gallons of paint. He then fell asleep for two hours, then woke up and realized he's in big trouble with the boss. Why is this so? The trouble was over 3 strikes on his to-do list. P.S. This should determine who is wide awake at this time or not.
Question
akaslickster
This is an original created by me. There was a painter arriving at work. He looked at his to-do list which read: He has 10 walls to paint and 6 hours to finish all by himself. Each 12' by 13' wall required a half gallon of paint. Once he was halfway finished with the job, he got high from the paint and spilled 1 and 1/4 gallons of paint. He then fell asleep for two hours, then woke up and realized he's in big trouble with the boss. Why is this so? The trouble was over 3 strikes on his to-do list. P.S. This should determine who is wide awake at this time or not.
Link to comment
Share on other sites
12 answers to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.